Resident guide · Checked November 27, 2026
Clallam County is updating its Critical Areas Code (CCC 27.12). The November 18, 2026 draft is under Planning Commission review and has not been adopted. If your property is near a wetland, stream, slope, or other critical area, the draft would, in many cases:
What is happening. These rules are Chapter 27.12 of the county code. The latest draft is dated November 18, 2026. Nothing in it has been adopted. (Nov. 18 draft; county Critical Areas page)
Who decides. The Planning Commission, a volunteer advisory board, is reviewing the draft. It will send a recommendation to the Board of County Commissioners, who make the final decision. No public hearing or adoption date has been set. (Planning Commission page; CivicClerk)
A little more on the buffers. A buffer is a strip of land next to a critical area where you generally cannot build or clear. Non-fish streams would go from 50 to 100 feet. Many wetland buffers get wider too, and the 300-foot wetland review area can include a lot even when the wetland itself is only on a neighbor’s property.
What you can do next. The Planning Commission continues its review at a work session on Wednesday, December 2, 2026, at 6:00 p.m. in Port Angeles and on Zoom. Public comment is on the agenda (three minutes per person). It is not a public hearing. You can also email a comment now. No written-comment deadline has been set. (Dec. 2 agenda)
This is an independent resident site, not a county or city website.
Side by side
Open a topic for today’s rule, the draft language, what it means for an owner, and the source. “ft” means feet.
“Buffer” means a strip next to a critical area that generally must be left undisturbed. Links go to the page of the county draft PDF or the current code section. Where this page could not confirm something, it says so.
Shoreline areas (larger rivers, lakes, and marine shorelines) are regulated by the separate Shoreline Master Program, CCC Title 35, which this page does not cover. Buffer numbers here are the draft’s standard widths. The buffer on a real site depends on what a site review finds, since county maps are advisory.
Have your say
Check the points you agree with. Each one adds a polite sentence to your letter. Email it to Principal Planner Donella Clark, or speak for three minutes on December 2. Nothing is sent for you, and nothing you type is stored.
Nothing on this site is legal advice or creates an attorney-client relationship. The information is general, may be incomplete or out of date, and is not a substitute for advice from a licensed attorney about your situation. For questions about your property or rights, consult an attorney or the issuing government.
Your letter will appear here.
If a blank message opens, or the text is cut off, use Copy Email Text and paste it into your email. Some email apps limit long links. Nothing is sent until you press send in your own email.
Later comments to the Board of County Commissioners go to Clerk of the Board Loni Gores, not to this address. Her contact is in the key dates section.
The details
Open a topic for more on buffers, reports, and relief. Section numbers like “27.12.215” refer to Chapter 27.12.
Table 1 lists what the chapter covers. For wetlands, the draft changes “within 200 feet” to “within 300 feet.” On the PDF, a struck “2” sits next to a new “3,” so it can look like “2300.” The number is 300. (draft p. 3)
The draft is not consistent yet. Section 27.12.212 says a wetland evaluation is needed within 200 feet, or 300 feet for high-impact projects. Sections 27.12.700 and 27.12.800 still say 200 feet. (p. 24, p. 65, p. 74)
Today, buffers depend on the wetland's Class (I–IV) and whether a project is “major” or “minor.” (current 27.12.215) The draft uses the Washington Department of Ecology's 2014 rating, which gives each wetland a Category (I–IV) and a habitat score. The buffer then depends on the project's impact level. (draft pp. 25–27)
| Wetland | Low impact | Moderate impact | High impact |
|---|---|---|---|
| Category I | 50–150 | 75–225 | 100–300 |
| Category II | 50–150 | 75–225 | 100–300 |
| Category III | 40–75 | 60–110 | 80–150 |
| Category IV | 25 | 40 | 50 |
The low end of each range is for wetlands with lower habitat scores; the high end is for high habitat scores. Category I also has set widths for bogs and estuaries. In the high-impact table, Category II with a moderate habitat score is printed as 100 feet, the same as “other” wetlands. This page reports it as printed; whether it is intended is not confirmed. Compare: today's Class II buffer is 150 feet for major and 75 feet for minor development. (draft p. 26; current Table 5)
The draft defines low, moderate, and high impact in 27.12.900(16). For homes (pp. 83–84):
Two things are unclear in the wording. A lot of exactly 5 acres fits both “5 acres or greater” and “one acre to five acres.” And the list does not clearly place a home on 5+ acres with more than 7,000 square feet of hard surface; the high list includes uses not listed elsewhere.
New 27.12.215(1)(b) lists “Required Measures to Minimize Impacts.” They include directing lights and runoff away, “covenants limiting use of pesticides and herbicides within 150 feet of wetland,” privacy fencing or dense planting at the buffer edge, and placing “wetland and its buffer in a separate tract or protect with a conservation easement.” The draft does not say which measures apply to which projects. (p. 27)
Ecology's 2022 guidance offers a choice called Option 1: narrower buffers when these measures are used, plus a habitat corridor for higher habitat scores. The draft makes the measures required but does not include the narrower Option 1 table. (Ecology Pub. 22-06-014)
The draft switches to state water types: Type F (fish-bearing), Np (non-fish, flows year-round), and Ns (non-fish, seasonal). Type S shorelines go by the Shoreline Master Program. Irrigation ditches and artificial channels are not streams unless salmon use them or they carry a natural stream. (p. 34, p. 93)
The separate “Class II” habitat section is deleted. “All new major development” in habitat areas needs a habitat management plan. The county “will require the applicant to employ a qualified professional at the applicant's expense.” Today the county may write the plan for small projects. Bald eagle plans are approved by the U.S. Fish and Wildlife Service. Wildlife buffers are set by the plan and can be increased up to 300 feet. (pp. 46–47, p. 75)
Note: the draft deletes the definition of “major development” but 27.12.320 still uses the term. This page could not confirm how the county will apply it.
The draft adds these to the landslide list: slopes 40% or steeper with at least 10 feet of rise (except solid rock), Holocene (geologically recent) landslide movement, stream incision or bank erosion, and snow avalanche areas. Today the steep-slope tests are 65% (planar) and 25% (concave). The 40% test was an erosion-hazard test, not a landslide test. Marine bluffs are removed from the list. (p. 49; current 27.12.410)
Shoreline bluff setbacks are set by the Shoreline Master Program, not this draft. Not covered here.
Flood: the rules still use FEMA flood maps and apply outside shoreline jurisdiction. Landowners may now ask FEMA for map changes. New floodplain projects may need a FEMA habitat checklist. A flood study may be needed if a project could raise flood levels more than one foot. (pp. 58–60, p. 80)
Critical aquifer recharge areas (where rain soaks in to refill groundwater): largely unchanged. A hydrologic study is now needed to waive the drainage-plan step for land disturbance. (pp. 62–64)
Lawful existing uses and buildings “may be continued, maintained, remodeled, or reconstructed provided there is no material expansion” within a buffer or critical area. A material expansion means a bigger footprint, or more bedrooms, bathrooms, or kitchens that add septic flow. (pp. 13–15)
These are simple examples built only from numbers in the draft. They are not real parcels. Your situation depends on a site review.
Today the buffer for one home is 60 feet (Type 3) or 65 feet (Type 2). Under the draft it is 150 feet. Averaging can cut it to no less than 112.5 feet at any point. It could be smaller if you show the site's tree-height potential is less than 150 feet. (p. 36, p. 69)
If the wetland has a moderate habitat score: on 3 acres (moderate impact) the buffer is 110 feet. On 6 acres with under 7,000 square feet of hard surface (low impact) it is 75 feet. (p. 26, pp. 83–84)
Today this is outside the 200-foot review area. Under Table 1 it is inside the new 300-foot area. Section 27.12.212 asks for a wetland evaluation within 200 feet (300 for high impact), so whether a report would be required is not clear yet. (p. 3, p. 24)
Repairs and same-footprint remodels are allowed. An extra bedroom that adds septic flow is a material expansion. It needs a certificate of compliance, possibly a variance before the Hearing Examiner, and a habitat plan if the buffer is disturbed. (pp. 13–15)
A 40% slope with 10+ feet of rise becomes a landslide hazard. That brings a geotechnical report and a 50-foot buffer. Cutting it to 20 feet takes the report plus an arborist assessment. (p. 49, p. 51)
Key dates and contacts
Next: Wednesday, December 2, 2026, 6:00 p.m. Planning Commission work session, Room 160 and Zoom. Public comment is on the agenda; it is not a hearing. Add to calendar
You do not need to post your address on this page. Look the parcel up on the county’s own sites, then compare the draft tables with what is actually on the ground.
Show up, or comment from home
Check CivicClerk the day of the meeting. Agendas can change. The posted December 2 agenda lists a 6:00 p.m. start and does not list an adjournment time. The calendar file uses 9:00 p.m. Pacific as a holding end time (2:00–5:00 a.m. UTC on December 3).
Do not go on December 16
The December 16, 2026 Planning Commission meeting is cancelled. There is no Critical Areas hearing that night.
The next regular Planning Commission dates are Wednesday, January 6, 2027, and Wednesday, January 20, 2027. As of November 27, 2026, no agenda has been posted for either date, and no public hearing has been noticed.
No written-comment deadline has been set. You can still email a comment now. If a hearing is scheduled later, the county notice will set the formal comment period.
Planning Commission, now
Principal Planner. Send draft comments here.
Board of County Commissioners, later
Clerk of the Board. Use this contact when the draft reaches the Board of County Commissioners.
Every number and quote on this page comes from a public county or state document linked here. If the county posts a newer draft, the county's version controls.